|
South Bay Design Center Inc.
2413 Pacific Coast Highway #207
Lomita, CA 90717
P: 310.539.6800
F: 310.539.1305
E:

|
 |
|
Bathroom remodeling can be a daunting
experience. Let our many years of experience
work for you by keeping the stress out of
your project. |
| |
|
South Bay Design Center offers a total
solution approach to the bathroom remodel
process. We will coordinate the entire
process from design to completion. Our
services include: |
| |
-
Demolition
-
Lighting
-
Electrical
-
Plumbing
-
Wall Removal
|
-
Drywall
-
Replacement windows
-
New construction
windows
|
-
Adding interior
walls
-
Waterproofing
-
Tiling
-
Cabinetry
|
-
Cabinet installations
-
Countertops
-
Shower enclosures
-
Exhaust fans
-
Heaters
|
|
|

Getting Started
To start the process simply visit our
showroom and provide us with approximate
dimensions of your bathroom. Once we have
this information we will discuss solutions
for your project. We will ask you for your
preferences regarding style, features,
layout and color. In most cases it is
possible to provide a budgetary cost
estimate at the end of the meeting.
How
do I get a quote?
To receive a design and cost proposal,
we will ask you to select a basic room
layout, cabinet style, and a list of desired
features. Once these selections have been
made, we will schedule a visit to your home
to measure and evaluate the space. Usually
we will be able to provide a final price
proposal at the conclusion of this visit. If
the proposal is accepted by you, a set of
drawings will be created so that you can
evaluate and fine tune the design.
|
|
Materials we supply
In most cases we supply the:
• Cabinets*
• Countertop*
• Shower door*
• Rough electrical*
• Plumbing materials*
• Basic rough building materials*
*These materials are included in the project
price.
Client supplied materials
We will ask that you purchase and supply
some of the materials, although in most
cases we can arrange for you to purchase
them at our cost. These materials include:
• Plumbing fixtures
• Decorative lighting fixtures
• Tile
• Wall paint
• Accessories
In regards to the tile, we will pick it up
and deliver it to your home for you.
How long will the project take to
complete?
Most projects can be completed during a
three to six week period. We have our own
dedicated crews that are managed by us, and
we start projects only after all materials
are on hand. This allows us to maintain
strict control of the schedule and the
construction process.
|
|
|